DTSY1088
Three Phase  Keypad Prepayment Meter
Technical Manual
Forward
General Safety Rules
DTSY1088 Three Phase Keypad Prepayment Meter owns advantages of simple measurement, simple installation and simple operation. But to avoid personal injury and other products related to the meter, it is suggested that this manual should be carefully read, which is better for usage before being installed, detected, operated and used.
While the designing and producing of DTSY1088 Three Phase Keypad Prepayment Meter, its solidity and reliability and users’ safety and convenience have been already fully considered. The meter printed circuit boards conformal coated, it’s Suitable for operation with average Annual Relative humidity up to 90% and altitude of up to 2,200m. If the meter is reasonably and safely installed and used according to the guideline, its lifespan will be extended. This product could only be used within its provisions; SHENZHEN HEXCELL ELECTRONICS TECHNOLOGY.,LTD. has no responsibility for the damage and personal injury caused by faulty operations, operation and the usage beyond the specific range.
Safety Information
In each chapter of this manual, different letter symbols and graphic symbols which are adopted to express the danger according to different levels of danger will be explained. Please pay attention!
Caution! 
This sign is to remind of possible danger, which will possibly cause some severe hurt and damage to people and the equipment.
Attention! 
This sign is to remind of possible unexpected situation, which might result in personal injury, equipment damage and data error.
Safety Rules
1)Pay attention to this product’s rated voltage and maximum current.
2)Pay attention to this product’s measured load capacity.
3)Correct and reliable installation and connection.
4)Pay attention to effective cross-sectional area of wire connection.
5)Do not touch bare wire or use bare wire to connect.
6)Please don’t use this product in explosive environment.
7)Keep the product’s surface clean.
8)Pay attention to meter’s seal management.
9)Don’t immerse the meter in water and any chemical substance and don’t use any chemical substance to clean the meter.
10)Displays are all examples in this manual, which may have some difference from the real data in meters.
11)Since it is life-threatening to touch live components, the power must be cut off before installation and replacement.
12)Please obey local safety rules; Installation and replacing of meter only could be done by qualified person with specified technology.
13)When installing meter, pay attention to meter’s safety; Appearance damaged or fell downed meters are not allowed to install.
14)Washing the meter by water is not allowed.
15)The Hexcell Standard applies to production and test in Hexcell Electronics, not the standard for client test or acceptance. Only IEC standards apply to the client inspection and acceptance.
COPYRIGHT NOTICE
Sustainable product improvement is a policy in Shenzhen Hexcell Co. Ltd. Therefore, the company reserves rights to change product operational details and specification. Contents of this manual may be changed without special notification. Without permission in writing from Shenzhen Hexcell electronics Co. Ltd., any part of the manual cannot be reproduced or spreaded in any form or by any means for any purpose by any individuals or other companies
1.Use Instruction
1.1 Overview
1.1.1.Major Application
DTSY1088 Three-phase Four Wire Keypad Energy Meter takes digital medium as information exchange media. It have a non-volatile memory capable of data storage and with long-term data retention period for a period of not less than 15 years. It is an active electric energy meter in which users load in pre-purchased electricity amount via 20-digit token which comply with STS standards. It takes electricity amount as its billing. It can realize the functions of active power measuring and pre-payment control meter includes BS5685 standard measurement unit, real-time clock unit, load switch and other auxiliary equipments, while LCD includes numeric keypad interface and display. The meter can be used at the point of supply. It is suitable for operation in Light Commercial & Industrial area and in tropical climate where temperatures may vary from -1 to +45 degrees Celsius.
1.1.2.Main Functions
1)Reverse consumption measured as forward consumption.
2)Realizing users’ load detecting and controlling.
1.1.3.Additional Functions
1)Recording event of cover open and power off events etc. 
2)When energy balance is 0, the meter can send out power off signal to control load for auto switching off, and it shall auto restore the power supply after the new purchased power amount is loaded. The load switch meet the IEC 62055-31 requirements. The load switch will not interrupt supply if only two (2) or one (1) phase(s) voltage is/are at 0 V.
3)Auto detection.
1.1.4.Major Features
1)The meter can realize paying first and using later.
2)DTSY1088 Three Phase  Keypad Prepayment Meter takes electricity as its electricity billing; Electricity users purchase electricity first, and meter subtracts energy balance. When energy balance is 0 or the overdraft amount allowed by both parties, meter will send power off signal to control load switch automatically cut off.
3)DTSY1088 adopts STS algorithm (NRS 009-6-7, NRS 009-6-8 and NRS 009-6-9), which has a set of security management system and owns a high level security and is completely compatible with the other STS standard systems.
1.1.5.Normative References
1)IEC62052-11 Electricity metering equipment (A.C)-General requirements tests and test conditions- Part11: Metering equipment. 
2)IEC62053-21 Electricity metering equipment (A.C)-Particular requirements-Part21: Static meters for active energy (classes 1 and 2).
3)IEC62055-31 Electricity metering -Payment systems-Part31:Particular requirements Static payment meters for active energy(class 1 and 2) 
4)IEC62055-41 Electricity metering-Payment systems-Part 41:Standard transfer specification (STS) - Application layer protocol for one - way token carrier systems
5)IEC62055-51 Electricity metering -Payment systems-Part51:Standard transfer specification(STS)-Physical layer protocol for one-way numeric and magnetic card token carriers
1.2 Technical Parameters
1.2.1 Meter Operating Voltage
1)Meter rated voltage Un                      3×230/400 V
Meter operating voltage range              50%Un~115%Un
2)Limit range of operating voltage:       0Un~150%Un 
Within this range, the meter will show no damage; it will indicate normally, but it’s not guaranteed that the accuracy class as well as load control equipment’s normal operation. After operating voltage turn to normal again, meter will work normally and its metering accuracy class will remain unchanged.  
1.2.2 Meter current parameters
1)Imax                                                     100A
2)Meter starting current (0.4%Ib)           40mA
3)Meter metering current range              40mA ~ 100A
4)Common current specification              10(100)A
1.2.3 Meter frequency parameters
1)Rated frequency fn 50Hz
2)Frequency application range 95% fn~105% fn
1.2.4 Self- power consumption of meter
1)Power consumption of voltage circuit ≤2W  10VA
2)Power consumption of current circuit ≤4VA
1.2.5 Meter active metering accuracy
DTSY1088’s active measurement accuracy conforms to IEC62053-21 class 1.
DTSY1088 --- Active power class 1 percentage error limit.
Table 1 1: Meter active metering accuracy
1.2.6 Display Mode
The meter displays numeric.
1)Display mode LCD display with backlight 
2)Character size for data item display ≥10.00*5.00mm
3)Character digits for data item display 8 digits including 6 integers and 2 decimal
4)Character digits for data ID display 2 digits
5)Principal unit for the measured values:       kWh
1.2.7 Meter Pulse Constant
1)Active pulse constant 1000imp/kWh
1.2.8 Meter Active Check Output
The meter is equipped with special pulse indicator for testing active energy (LED is on the nameplate of meter). In order to ensure the accuracy of active measuring test, according to different current test points, pulse quantity collected from test should be incremented with the increase of current, and reasonably select pulses between the numbers 1~8. 
1.2.9 Meter Serial Communication Interface
Interface 1:
1)Type Serial bi-direction communication interface
2)Baud rate 4800bps
3)Application            Measuring data reading and related data item configuration
4)Pattern Non-modulated IR communication
Interface 2:
1)Type PLC  communication interface
2)Baud rate 2400bps
3)Pattern PLC communication
1.2.10 Meter EMC
Table 1 2: EMC
1.2.11 Meter application environment

Table 1 3: Application environment
1.2.12 Meter insulation test
Table 1 4: Insulation test
1.3 Meter Operating Principle Diagram
This meter circuit consists of measurement and control circuit modules centralized with SOC single chip (with internal measurement module, real-time clock and temperature testing compensation circuit etc.), memory circuit module composed of memory chip, M-BUS module, power supply circuit module, cover open detection module, LCD display, audio reminding user information display module, IR emission and IR receiving circuit module etc. the current sampling uses measurement method of CT sampling, while voltage sampling uses dividing resistance network, and meter adjustment is completed via software.
2.Physical Design
2.1 Meter Construction Diagram
meter  diagram:

2.2 Meter Dimension Diagram
Meter dimension diagram:
Outline dimension: 240mm×170mm×73mm
2.3 Meter Wiring Diagram
All movable terminals of meter locate in the connection terminal cover with secured screws fitted with user seal to prevent from operations such as unauthorized connection or other settings, etc. The terminal cover of the meter is flush to the meter base.
2.4 Terminals
All movable terminals of the meter locate in the connection terminal cover with secured screws fitted with user seal to prevent from operations such as unauthorized connection or other settings, etc. The terminal screws are made of nickel-plated brass for high conductivity and corrosion resistance. The terminal holes are able to accommodate the cable of 10mm diameter.
2.5 Meter Protective Class
The meter protection class is Class II, double insulated. The test is carried out with the keypad energy meter produced by SHENZHEN HEXCELL ELECTRONICS TECHNOLOGY.,LTD in accordance with IEC60529-4. meter is ultrasonically sealed for life to prevent access to the meter and is sealed so as not to allow malfunction due to ingress of vermin. The meter test results are shown as follows: IP 54. Resistance to Heat and Fire
Resistance to heat and fire class: V0 (all the casing made out of heat-resistant and fire-retardant material)
3. Meter Function Lists
3.1 Active Energy Metering
DTSY1088 can measure reverse power in the same way of measuring forward power and the energy can be accumulated in total active energy and active energy of each settlement month. It also has impulse LED and output terminal to detect the status of meter.
Meter will record balance and accumulated kWh respectively. To inquiry the accumulated kWh, user just need to input the STS standard testing token. When the balance is 0, meter will automatically trip. And only after recharge the meter, the relay will automatically back on.
3.2 Recharging Function
The meter is preloaded with 0 kWh. If customer buy the token from POS, input the 20 digits STS standard encrypted token on the LCD, the meter will automatically recharge the relevant kWh, and on meter LCD display “ACCEPT”.
When the inputted kWh and the balance in the meter is more than 999999.99kWh, the meter will automatically reject recharge. But this token can be reused when the balance is less than the maximum energy. 
Meter will automatically verify if the TOKEN has been used or not. Meter will automatically verify the TOKEN time and recode the last 50 times used TOKEN. If the lastest inputted TOKEN time is earlier than the previous 50 times TOKEN, meter will REJECT this token. In this case pls consult the TOKEN vending point.
3.3 Tampering Alarm Function
The meter is supplied with loading switch in open mode and installer can open terminal cover when meter is not activated by commissioning token. After installation of meter, the installer can input a commission token to close the loading switch and activate terminal cover open detection function. After commissioning token in put into the meter and loading switch closes, opening of the terminal cover will lead to tamper.  When meter has power and terminal cover is opened, meter will disconnect immediately.  When meter has no power and terminal cover is opened, meter will  detect  and record  the  event  and  disconnect  immediately power resumes.
Under the condition of cover opening and current reverse, meter will alarm. The alarm won’t disappear even the tampering is finished when opening meter cover and terminal cover. This status can only be removed by TAMPER TOKEN. On Repair Column, Token means only after input token can clear the icon. Repair means after the tamper even ended, the icon will disappear.
3.4  Meter data inquiry
a) Standard STS testing order. The supported orders are listed below:
1) Relay ON/OFF test
TOKEN: 0000_0000_0001_5099_7584
2) Full test of the above mentioned test
TOKEN: 5649_3153_7254_5031_3471
b) Input token .
Please refer to Input Display section
3.5 Power-off Trip Function
When meter detect power off, it will auotomatically trip, when the power goes back to normal, meter will automatically restore to the previous relay status.
3.6 Over Power alarm function
When the power exceed the threshold, meter will enter into the over power status and display “OUE_LOAD”. Only after the power is less than threshold, this message will disappear. Input 47 to display the current power, input 07 to display the threshold of meter. The threshold can be settled by STS token.
In addition, the meter has the below over power function:
1.When the power exceed the settled threshold 10 seconds, meter will enter into Over power status.
2.If over power existing more than 45 seconds, meter will automatically trip and after 150 seconds relay will automatically back on.
3.If the meter enter into over power status more than 5 times, meter will display ‘5OUE_LOAD’ and then after the 5th trip, the relay will back on after 30 minutes.
3.7 Clear balance Function
By using STS token, the total balance in the meter will be cleared to 0 and the meter will trip immediately. Meter will display “ACCEPT”
3.8 Changing KEY Function
The meter KEY can be changed by STS token. The rules of changing key comply with IEC 62055-41 standards. Firstly, please refer to the below table to confirm if the different level of key can be changed or not.
3.9 Data record Function
Meter can record the charging and tampering information, please use the IR software to read the data by optical head.
3.10 Prepaid/Postpaid Mode Changing Function
In considering of security, Hexcell provide Prepaid/Postpaid Mode changing function by optical head. Firstly, attach the optical head to the optical port of meter, then Open the PC software copy provided in with CD. Click    “Setting” and then tick “Meter Mode” checkbox. In the Value Setting Column if the value is “33” means, meter is on Prepaid Mode; If the value is “55” means the meter is in Postpaid Mode.  Pls be noted that changing the paid mode will clear all kWh information.
3.11 Prepayment Function
The Power Sales Management System will produce a 20 digits code (generated based on user’s information and purchase amount). After the user input this code via the meter’s keypad, meter will decrypt the code. After passing the encryption authentification, current purchase amount will be written into meter’s memory and added to the energy balance and stored; When abnormal consumption happens, the abnormal consumption amount will be deducted from the purchase amount and the new energy balance will be stored in memory; When the user is consuming power, the meter will deduct the energy balance gradually according to corresponding conditions. When the power-off condition is met, meter will cut off power supply and when power supply condition is met, meter will connect to user load automatically.
1)Open an Account
Opening an account is necessary after the key system of meter is changed and user information registration is completed. Opening an account can give user a number and appointed ID in order to correspond one meter with one user. At the same time, initial purchasing power, the key and other parameters can also be written into meter.
2)Purchase Power
When the energy balance in meter is insufficient, the customer can visit the power vending office to purchase electricity. At vending office a 20 digits serial number (TOKEN) including the kWh information will be produced based on user information and purchase amount. After obtaining the 20-digits token, load it into the LCD. The LCD will increment the purchased kWh into the balance but will not loss any existing credit balance. Upon acceptance of a valid token credit the exact amount contained on the token to the appropriate register in the meterand shall increment the register by this amount and then display the cumulative kWh register.
Power purchase method:
4)Visit the local power vending office.
5)Provide your meter ID to the operator.
6)Inform the operator the amount you want to buy and pay the bill.
7)Obtain a 20-digits token printed on your receipt.
3)Load power
User will input the 20-digits serial number via meter’s keypad. After passing key authentification, meter will accept purchase amount and adjust the energy balance and cumulative purchase amount and then save the new energy balance in EEPROM. At the same time power amount loaded this time will also be displayed on LCD. 
8)Key in the 20-digits token via keypad.
9)Confirm the numbers on LCD.
10)If token is wrongly input, please use backspace to modify.
11)After inputting all the 20 digits, push Enter to confirm the token input.
12)If token is correctly input, LCD will display “accept” and the power amount purchased.
If token is wrongly input, LCD will display “reject”. user can press the “Sequence-Backspace” button to delete the wrong digit.
3.12 LCD Display
3.10.1Display 
When meter is energized, the LCD will initialized and display all contents. After 4 seconds, LCD will display the setted parameter. 


3.10.2 Scroll Display
If there is no operation, meter will display: Balance
3.10.3 Short Code  Display
Short Code List



3.13 Indicator Status
1)meter indicator state:
a)Pulse indicator: Red, blinks during power consumption.
b)Alarm /Communication light: 
Red: lighting when the alarm events. 
Green: Communication light.
c)Balance indicator: 
Green: greater than the threshold .
Red: when low energy indicator.
3.14 User Card
The meter is supplied together with a plastic card of dimension 85mm X 54 mm indicating the meter number on the face side.
4.Communicate with Vending System 
The meter can support two way commuication with the vending system. If needed, the meter can be upgradable to smart prepayment meters by programming via the optical port. The communication protocol will be DLMS/COSEM open protocol. And meter could continue metering and decrement credit.
5.Meter Installation Instruction
5.1Cautions on Operation
The meter of BS5685 Standard mounting. The installation and commission operator of energy meter must be technically qualified as below: 
1)Trained with relevant technical training.
2)Be familiar with and comply with safety regulations, strictly comply with specific regulation of safety.
3)Please see if the required materials and tools are all prepared before starting operation (see 4.2 “Tools and Materials required”).
5.2Tools and Materials Required
The following tools and materials are necessary for installing the meter:
1)The energy meter preset correctly (already opened an account) and sealed well.
2)Customers’ information chart of energy meter.
3)Screws to fix energy meter.
4)Seal and seal tools provided by the Utility.
5)Slotted screwdriver and cross screwdriver which are used to secure screw.
6)Drilling tools (if it is needed) and multi-meter.
5.3Installation Dimension Figure
meter  installation dimension figure:
5.4Cautions on Installation
1)Before wiring, please carefully check the connection diagram on meter case and confirm the phase line, and neutral line (ground wire) consistent with connection diagram. It is better to use copper wire and copper contact to connect to meter.
2)If the cable is old, operator shall cut the end of cable to ensure the new exposed wire end is about 15mm long to be used to connect; if cable diameter is between 3mm and 6.5mm, directly connect to inside of terminal and make sure it secured; if cable diameter is less than 3mm, then it is necessary to use a suitable size copper or aluminum bushing to clamp cable end so as to avoid loose contact of connection resulting in terminal burnout.
3)During wire-connection, firstly loosen each screw on each terminal, then insert In-phase line into end of connection aperture and the in-neutral line into end of connection aperture, fully tighten screws of terminals. Similarly insert Out-phase line into end of connection aperture. Tighten screws of terminals fully and make them secured.
4)Power on energy meter to test the working condition, if energy meter works normally, record readings of meter. Otherwise, please carefully test condition of installation and connection and working voltage.
5)Be gentle with the energy meter so as to avoid dropping and collision during whole installation processes.
6)When installing energy meter, please be careful with operation and power usage safety so as to avoid accident.
6.Transport and Storage
1)The product shall be transported and stored according to the related rules. No intense impact to the product is allowable during transportation and unpacking.
2)The product shall be stored in a clean place where the ventilation is good, the ambient temperature is -25℃~70℃, and the relative humidity is not more than 75%, and make sure no corrosive gas or harmful material present and the natural ventilation is good.
3)The product shall be stored on shelf in a warehouse and the stacking height shall not be more than 8 layers.
7.Warranty
The manufacturer warrants its products against defective parts and workmanship and will repair or (at its option) replace, free of charge, any meter which is or may become defective under proper operation with all seals in good condition within the warranty period specified in contract from date of sales.
8.Troubleshooting
The meter features self-test. If the following information is found on the LCD, or the self-test information displayed on LCD is abnormal (e.g. character missing or character incomplete etc.), contact the manufacturer for advice.
9.Service
SHENZHEN HEXCELL ELECTRONICS TECHNOLOGY CO., LTD. guarantees to provide a lifetime service with the meters and the related devices made in our company. In product distribution areas, there are offices and or agents accompanying with customer service center responsible for providing customers with product consultation and maintenance service etc..
Tel: 0086-755-26622430
Fax: 0086-755-26621430
Add: 1-6# Bldg., Tongfuyu Industrial Zone, Aiqun Road, Shiyan Town, Bao’an District, Shenzhen, China 
Zip code: 518108
E-mail: overseas@hexcell.cn
Website: http://en.hexcell.cn/